General Concepts For Breaking Of Boulders

Underground Excavation

Splitting of Large Boulders

Breakage of Virgin Rock
The toe should be drilled at closer hole spacing andsuccessively broken from the front row.No drilling will cause poor breakage.

The front holes (up to the sixth row) may be simultaneously filled in.It is more effective for removal to fill in one hole and then each two rows (2, 3) after a delay of 6 – 20 hours.
Trenching

Tunneling

Reinforced & General Concrete

Thin Concrete

Mass-Concrete-&-Pile-Foundation

Thick Wall

Pier / Bridge / Foundation

Zone Demolition

Delayed Filling